case study 3.

CLIENT:

FAWAZ GRUOSI

DURATION:

38 WEEKS

LOCATION:

BERKELEY SQ, LONDON

Key Aspects:

  • Flagship store

  • Exacting interior design and fitout

  • Bespoke jewellery display cases 

  • State-of-the-art security installations

  • Existing building/landlord requirements 

Professional Team:

Architect – BLDA Architects

Interior Designer – Francis Sultana

Structural Engineer – Milk Structures

M&E Engineer – E+M Tecnica

Security - TSI, Burton and Warrior 

Project Manager/QS – Arc Construction Consultants

Project Summary:

This project involved SD taking on the main internal fit out of 2 levels within the existing building and converting the property into a brand new, exclusive Jewellery Store.

 

Works included the fitting out of the ground floor and basement, building an interconnecting stairway, installing a range security-controlled measures, including a new vault, high security/ specialised windows, doors (including secure vestibule airlock door/ main entrance), CCTV and Intruder Alarm Systems.  All associated internal works including bespoke high-level joinery, lighting, AV, marble, carpets, vitrines, finishes, fixtures and fittings and installation of an external sculpture and new signage.  Modifications to the internal services and connections to the incoming mains.
 