CLIENT:
FAWAZ GRUOSI
DURATION:
38 WEEKS
LOCATION:
BERKELEY SQ, LONDON
Key Aspects:
-
Flagship store
-
Exacting interior design and fitout
-
Bespoke jewellery display cases
-
State-of-the-art security installations
-
Existing building/landlord requirements
Professional Team:
Architect – BLDA Architects
Interior Designer – Francis Sultana
Structural Engineer – Milk Structures
M&E Engineer – E+M Tecnica
Security - TSI, Burton and Warrior
Project Manager/QS – Arc Construction Consultants
Project Summary:
This project involved SD taking on the main internal fit out of 2 levels within the existing building and converting the property into a brand new, exclusive Jewellery Store.
Works included the fitting out of the ground floor and basement, building an interconnecting stairway, installing a range security-controlled measures, including a new vault, high security/ specialised windows, doors (including secure vestibule airlock door/ main entrance), CCTV and Intruder Alarm Systems. All associated internal works including bespoke high-level joinery, lighting, AV, marble, carpets, vitrines, finishes, fixtures and fittings and installation of an external sculpture and new signage. Modifications to the internal services and connections to the incoming mains.