Kensington Palace Gardens
KENSINGTON

Case study 2.

CLIENT: PRIVATE

DURATION:

72 WEEKS

LOCATION:

KENSINGTON, LONDON

Professional Team:

  • Architect - Studio Mackereth

  • Structural Engineer – Heyne Tillet Steel

  • M&E Engineer – Environmental Engineering Partnership

  • Project Manager/QS – Jackson Coles

Project Summary:

Key Aspects:

  • Full internal refurbishment

  • Full mechanical and electrical installations

  • Replacement of all windows

  • External landscaping and paving works

Set within a 1960s Richard Seifert modernist building in Kensington Palace Gardens, the project entails a full 500sqm internal refurbishment and fit out of a duplex apartment located on the ground and first floor of a building in multiple occupation – the common parts of which are controlled by the Landlord, and the separate self-contained former Chauffeur’s flat.

 

The scope of the works includes the installation of prime luxury finishes throughout including the replacement of external louvres, joinery, windows and kitchen.

 

Full mechanical and electrical service installations were carried out in addition to external landscaping and paving works.

SHOT_1_SM_017_RT_V1.webp
SD 1.png

Accredited by Construction Industry Training Board (CITB)             

CITB Logo.png
The-Guild-of-Master-Craftsmen1.jpg

 and Guild of Master Craftsmen.

Copyright 2022 SD Shopfitting LTD | All Rights Reserved

Unit 1, Riverside Estate, Coldharbour Ln, Harpenden AL5 4UN | 01582 712160

Website proudly designed by THREE2

bottom of page