top of page
moncler logo.png

case study 4.

CLIENT: MONCLER

DURATION:

20 WEEKS

LOCATION:

LONDON

Moncler lonodon 2.jpeg

SLOANE ST - LONDON

Key Aspects:

Structural Alterations

Exacting Interior Design 

Main Contractor 

M&E Installations

Project Summary:

The new store has a retail area of 250 square metres on two levels, with two large shop windows overlooking one of London's luxury shopping destinations.

 

The store’s façade blends brass with green Gressoney marble, while the interior's wall-panelling ranges from brick red to green hues, with pink and dove grey prevailing on the floor dedicated to women's products, and musk green moiré silk and walnut wood on the floor dedicated to men’s. products and accessories. 

moncler 1.jpeg
Moncler Bond.jpg

BOND ST - LONDON

Key Aspects:

Flagship store Exacting interior

design and fitout

 

Structural alterations to

enable store expansion

 

State-of-the-art security installations

 

Store trading whilst expansion took place

Project Summary:

SD have a long standing relationship with Moncler over the past 10 years, chosen to be the main contractor for their flag ship New Bond Street store. 
 

After a successful project SD were appointed main contractor for the store expansion to Albemarle Street. Major structural alterations took place to enable the 2 units to become 1, all whilst the store was trading.  

Moncler Bond 3.jpg
bottom of page