CLIENT: POMELLATO

DURATION:

28 WEEKS

LOCATION:

BOND ST, LONDON

Key Aspects:

  • Demolition of existing roof, stairs and floors

  • Structural steelwork to accommodate new floor layout 

  • New roof installation 

  • Full fit out of front and back of house areas 

Project Summary:

Working with the Italian Architects, SD undertook a complete refurbishment of the building which involved the structural remodelling and fitting out of a high-end jewellery boutique, spread over 5 storeys including offices and included removal of the roof, stairs and all the floors from the basement to the fourth floor.

 

There were a number of key matters that were important to our client during the project:

Project finish date

Quality of the work

 

Ensuring that neighbouring businesses- which included the Richard Green Gallery and Sotheby’s auction rooms - suffered no loss of revenue or prestige.

 

In order to achieve the project objectives, the shop fit-out was started whilst the structural works were still ongoing; although this is not unusual in the industry it is something which always requires careful planning and scheduling.

SD 1.png

Accredited by Construction Industry Training Board (CITB)             

CITB Logo.png
The-Guild-of-Master-Craftsmen1.jpg

 and Guild of Master Craftsmen.

Copyright 2022 SD Shopfitting LTD | All Rights Reserved

Unit 1, Riverside Estate, Coldharbour Ln, Harpenden AL5 4UN | 01582 712160

Website proudly designed by THREE2

bottom of page